Solar Panels Cost $3.9k-$11k in Santa Cruz County, AZ | December, 2024
High Power Bills?
Reduce or replace your electricity bill with solar
No data available
How much do solar panels cost in Santa Cruz County, AZ in 2024?
No data available
As of December, 2024, the typical cost to have solar installed in Santa Cruz County, AZ is $2.82 per watt.
It will cost you $2,820, on average, per 1000 watts (1 kW) of capacounty that your solar panels have. When you consider the 30% federal tax credit, a 5 kW solar panel install in Santa Cruz County will cost approximately $9,870. A larger system could be essential to meet your energy demands effectively.
By selecting your county on the left, you can determine the average roof size and the maximum capacity for residential solar on homes in your area. See below a detailed summary of the {price|costs, payback period, and 20-year average savings for a 5 kW system in your county.
Average out-of-pocket cost for a 5 kW system The upfront amount spent to buy and install solar.
Santa Cruz County: $9,870US Average: $12,523
Average Payback Period The number of years until you break even on the solar investment.
Santa Cruz County: 6 yearsUS Average: 7 years
Average Net 20-year savings The total amount of money saved over 20 years minus the out-of-pocket cost.
Santa Cruz County: $20,083US Average: $16,152
Solar Potential in Santa Cruz County
Estimated system size and solar electricity production per median viable roof in Santa Cruz County.
Roof size 1,055sq. ft.
Capacity 14.75kW DC
Electricity 24.3kkWh AC per yr.
Electricity Costs in Santa Cruz County, AZ & What that Means for Your Solar Panel Pricing
With a typical monthly usage of 889 kWh, Santa Cruz County citizens have electric bills around 142.43 each month. Be mindful that this statistic encompasses apartments and other smaller living spaces that generally have lower energy use.
The rate of electricity in Santa Cruz County, AZ, averaging, is 16.03¢ per kWh for December 2024.
After incentives, a 6 kW solar panel installation is priced at around $11,844.
Go Solar for less than your cell phone bill.
Average solar panel costs by system size in Santa Cruz County
Shown on the left, you will find a pricing structure for multiple solar panel system sizes installed in Santa Cruz County. The investment for a bigger solar panel setup is higher, but it also provides greater electricity savings and higher income tax credits.
The solar panel calculator, located to the right and below, provides a detailed cost and benefit analysis based on a typical $142.43 electric bill for Santa Cruz County. To get customized results, just adjust the $142.43to match your typical electricity bill amount.
System Size
Roof Size Min. space required
Electricity Value Annual Production
Est. Price
System Size 2kW
Roof Size Min. space required
143 ft²
Electricity Value Annual Production $579 a year
Est. Price
$3,948
Savings from a 2kWthis system
Est. yearly production 3,619 kWh
Est. monthly savings $48
Full payback in 2 years
Environmental Impacts
Reduces CO2 emissions by 1.25 tons a year
Equivalent to planting 57 trees a year
Equivalent to driving 3,082 mi less a year
System Size 3kW
Roof Size Min. space required
215 ft²
Electricity Value Annual Production $869 a year
Est. Price
$5,922
Savings from a 3kWthis system
Est. yearly production 5,429 kWh
Est. monthly savings $72
Full payback in 3 years
Environmental Impacts
Reduces CO2 emissions by 1.87 tons a year
Equivalent to planting 86 trees a year
Equivalent to driving 4,623 mi less a year
System Size 4kW
Roof Size Min. space required
286 ft²
Electricity Value Annual Production $1,158 a year
Est. Price
$7,896
Savings from a 4kWthis system
Est. yearly production 7,239 kWh
Est. monthly savings $97
Full payback in 5 years
Environmental Impacts
Reduces CO2 emissions by 2.49 tons a year
Equivalent to planting 114 trees a year
Equivalent to driving 6,164 mi less a year
System Size 5kW
Roof Size Min. space required
358 ft²
Electricity Value Annual Production $1,448 a year
Est. Price
$9,870
Savings from a 5kWthis system
Est. yearly production 9,048 kWh
Est. monthly savings $121
Full payback in 6 years
Environmental Impacts
Reduces CO2 emissions by 3.11 tons a year
Equivalent to planting 143 trees a year
Equivalent to driving 7,705 mi less a year
System Size 6kW
Roof Size Min. space required
429 ft²
Electricity Value Annual Production $1,737 a year
Est. Price
$11,844
Savings from a 6kWthis system
Est. yearly production 10,858 kWh
Est. monthly savings $142
Full payback in 7 years
Environmental Impacts
Reduces CO2 emissions by 3.66 tons a year
Equivalent to planting 168 trees a year
Equivalent to driving 9,069 mi less a year
Santa Cruz County Solar Panel Installation Incentives & Rebates | 2024
For rural farms and small businesses, the REAP Grant might currently cover between 80% and 100% of the expenses for installing photovoltaic or wind energy systems. Wondering if you qualify? Our REAP Grant eligibility tool can help you check.
For residential solar installations, almost all homeowners qualify for a 30% federal income tax credit, which makes solar energy a feasible choice in many parts of the country. State and local governments have various programs to further encourage the switch to solar energy.
Arizona has 21 solar incentive and rebate programs available through a range of utilities and government bodies.
Solar incentives in AZIncentive Description Value
Duncan Valley Electric Cooperative - SunWatts Rebate Program
Value:Up to $500
Members of the Duncan Valley Electric Cooperative can receive rebates for renewable energy systems through its SunWatts program for renewable energy systems. The program offers rebates for wind energy and photovoltaic systems of 10 kilowatts or less; members purchasing them can receive a rebate of $.05 per watt up to $500. Solar water heating systems can receive a rebate of $.50 per kilowatt-hour of their estimated energy savings for its first year. The program should encourage members to purchase systems that would help the cooperative meet its energy needs while remaining environmentally friendly.
Residential Solar and Wind Energy Systems Tax Credit
Value:Up to $1,000
Arizona is offering a Solar Energy Credit to individual taxpayers who install a solar or wind energy device at their Arizona residence. The credit can be applied against their personal income tax; the credit is one-fourth of the cost of solar or wind energy, up to $1000. The number of devices does not matter. The credit may be claimed in the year that the devices are installed or up to five years if the amount exceeds their tax liability. Taxpayers who lease the system or enter into a third-party power purchase agreement are not eligible to receive the credit.
Mohave Electric Cooperative - Renewable Energy Incentive Program
Value:Up to $2,500
Mohave Electric Cooperation has incentives to encourage its customers to install renewable energy systems in the homes and businesses, and thus help them save money on electric bills. It provides rebates for small commercial and residential photovoltaic and wind systems; however, rebates for solar water heaters are available for residential systems only. These rebates should help offset the price of those systems, making them more attractive to potential buyers and eventually helping them to help better the environment. Also, residential and business customers must meet all applicable terms and conditions with the appropriate forms submitted through their website.
Southwest Gas Corporation - Commercial High-Efficiency Equipment Rebate Program
Value:Varies
The Southwest Gas Corporation offers rebates to commercial customers in Arizona who purchase energy-efficient natural gas equipment in order to better assist environmental measures. Customers of the natural gas company may apply for custom incentives. Those commercial customers interested in obtaining a rebate for their natural gas equipment should refer to the Southwest Gas Corporation website for more information. A list of rebates available through the Southwest Gas Corporation may found here. The rebates should encourage customers of the company to better access more energy-efficient equipment for their companies' needs.
SRP - Solar Water Heating Program
Value:Varies
The Salt River Project's Solar Water Heating program provides incentives to encourage its residential customers to purchase solar water heating systems as back-ups to their electric systems, in hopes that the residential customers will use the renewable energy systems in preference to their familiar systems. The usual incentive for residential solar water heating systems is $0.30 per kilowatt-hour of the estimated annual energy savings, determined by calculating current use to determine estimated use for the next year. The incentives are pro-rated ($0.24 per kilowatt-hour) for systems where solar collectors are installed in sub-optimal locations, such as shady areas.
Tucson City - Solar Farm Permit Requirements
Value:Varies
The City of Tucson requires several permits for solar farms. This table shows all of the relevant information about the applicable regulations that apply to anyone looking to establish a large solar facility. For example, permits are required for groundwater/surface water management, review for the site/development plan, preconstruction, and the electrical permit. Permits last one day or 14 months, depending on the specific permit, so pay attention to the dates on each permit and mark them on a calendar to avoid confusion. It should be noted that some permits may not be needed, so check with the appropriate agency before paying for a permit.
Sulphur Springs Valley EC - SunWatts Rebate Program
Value:Varies
The SunWatts program offers home and business owners incentives for purchasing solar water heating systems. The ideal is that residential and business customers of various companies will take advantage of the incentives offered through the SunWatts program and upgrade their homes. Also, the solar water heating systems may encourage the homeowners and business owners to try other renewable energy systems, especially once they see how much the heating systems save them. Systems must meet all program requirements, and incentives are usually available through local companies. See the SunWatts program website for complete details on rebates offered and other incentives.
City of Phoenix - Renewable Energy Goal
Value:Varies
The Phoenix City Council approved a renewable energy goal for the city in 2008. The goal is for 15% of the city's electricity to come from renewable sources by 2025 and mirrors the state's Renewable Energy Standard. It plans to accomplish this renewable energy installation, which is city-owned or city-sponsored, mostly through public-private partnerships. The city council will review periodically the progress towards the goal, setting milestones to track progress. The Environmental Quality Commission and Public Works Department collaborated to develop the recommendation. Phoenix recently expanded its sustainability goals, which also include becoming carbon-neutral by 2060. The paper laying out these goals can be found at https://www.phoenix.gov/sustainabilitysite/Documents/COP_028%20Sustainability%20Brochure12%2C%20Feb%202017.pdf.
Renewable Energy Tax Credit for International Operations Centers (Corporate)
Value:Varies
A 2014 act of the Arizona legislature created tax incentives on new solar, wind, or other renewable energy systems used to power "international operations centers." To qualify for the credit, systems should be rated for at least 20 MW of generation capacity or produce 40,000 megawatt hours of electricity per year. "International operations center" certification is obtained through ten years of investment records in new Arizona-located capital. Additional information is available from the state department of revenue.
Solar Contractor Licensing
Value:Varies
The Arizona Registrar of Contractors does not offer a general solar electric contractor license, but the state's R-11 and C-11 electric licenses cover solar electric installations. The Registrar also has licenses for solar water heaters. There are also licenses for space heating and cooling systems, including solar thermal systems. For those interested in working with pools that include a solar pool heating system, there is another license. All contractors that work with solar energy systems must have four years of applicable work experience and pass an exam in order to obtain a license in Arizona.
Trico Electric Cooperative - SunWatts Incentive Program
Value:Varies
The Trico Electric Cooperative offers its residential and business customers a rebate for installing solar water heaters into their homes and businesses, thus helping to encourage the use of sustainable energy in those homes and businesses. Rebates equal $.40 per kilowatt that is expected to be saved in the first year of the use of solar water heating systems, as compared to the systems that they are used to using to heat their water. The rebates are offered through the SunWatts program, and should encourage its residential and business customers to look for another way to use renewable energy sources in their homes and businesses.
City of Chandler - Green Building Requirement for City Buildings
Value:Varies
In June 2008, Chandler, Arizona, adopted Resolution 4199, establishing an ordinance requiring all newly occupied city buildings larger than 5000 square feet to be designed to achieve the Silver Level of the Leadership in Energy and Environmental Design certification program, striving for higher certification levels whenever project resources permit. City projects may be exempt from the payback necessary to recover the initial cost if it takes more than ten years to recoup costs. If it is deemed infeasible, then the project shall follow as many of the LEED principles as possible. Additionally, buildings smaller than 5000 square feet must include as many of the principles as possible.
City of Scottsdale - Green Building Policy for Public Buildings
Value:Varies
Scotsdale approved a green building policy for new city buildings and remodels in 2005. All newly occupied buildings of any size are to be designed, contracted, and built to achieve Gold certification by the principles of the US Green Building Council's Leadership in Energy and Environmental Design program. Where the payback is anticipated to take more than five years, the city staff may recommend which level of LEED certification is appropriate for the building in question. In addition, ll renovation to non-occupied buildings will be designed, contracted, and built with as many of the LEED principals as is feasible.
Renewable Energy Standard
Value:Varies
The Arizona Corporation Commission is debating changes to the state's Renewable Energy Standard to expand the standard to 15% by 2025, with 30% of the renewable energy coming from distributed energy technologies. The new rules were certified as constitutional and were allowed to go forward. Prior to the 2006 rules, Arizona's original Environmental Portfolio Standard required Arizona 0.4% of its energy from renewable sources; this was increased incrementally to 60% by 2012. The RES should allow Arizona to meet its goals, and to eventually see more of its energy needs being met by renewable energy sources.
Maricopa Assn. of Governments - Solar Domestic Water Heating Permitting Standards
Value:Varies
The Maricopa Association of Governments passed permit submission requirements for residential solar domestic water heating systems on June 18, 2003, in an effort to promote uniformity. Prior to passing the permit submission requirements, consumers were seeing different standards and procedures that varied from installer to installer; this made the installation of a new system or repair of the old one difficult. By enforcing the requirements they were able to help put a lid on the chaos. The MAG is a council of governments that serves as the regional agency for the metropolitan Phoenix area. The standards were revised in May 2012.
City of Scottsdale - Green Building Incentives
Value:Varies
The Scottsdale Green Building Program was the first such program with an emphasis on residential home construction. Established in 1998, it encourages environmentally responsible building in the Sonoran Desert. The program's goals are to reduce the impact of building, achieve both the long and short-term savings of energy, water, and other natural resources, and encourage a healthier indoor environment. Incentives include green building permits and inspections, technical assistance, monthly lectures, recognition on the website, free promotional materials, and a homeowner manual; depending on criteria, homeowners can be designated as either basic or advanced. Projects must complete a Green Home Rating Checklist to qualify for incentives.
SRP - Net Metering
Value:Varies
The Salt River Project modified its net-metering program for residential customers in February 2015. Effective with the April 2015 billing cycle, residential customers who generate part of the electricity onsite are billed under the Customer Generation Price Plan. Customers that have purchased their distributed energy system or signed a lease agreement before December 8, 2014, may keep their original plan for twenty years. Net-metering allows customers discounts on the energy bill if they produce more electricity than they use. While the Arizona Corporation Commission adopted net-metering rules in October 2008, the state's rules do not apply to Salt River Project customers.
Interconnection Guidelines
Value:Varies
The Arizona Corporation Commission initiated a rule-making process to establish statewide interconnection standards for distributed generation. The proceedings are still in effect, and the commission has recommended that the utilities use the Interconnection Document as a guide. The state's utilities developed interconnection agreements prior to the ACC's ongoing proceedings. Each utility has adopted its own standards, sometimes based on different metrics than other utilities. It is likely that Arizona's regulated utilities will adopt the ACC's interconnection standards when the final rules are adopted in order to provide a system that will enable all utilities to provide consistent service across the state.
Phoenix City - Municipal Code 232 Residential Solar PV System Permit
Value:Varies
The City of Phoenix offers permit plans for photovoltaic use. More specific information can be found in the city's application found here. For every option listed, the existing electric service will remain and the installer must be present for any inspection. Option A: Over-the-counter review, $600 plan review with three inspections. Option B: Over-the-counter review, $450 plan review, and two inspections. Option C: No plan review, $375 administrative fee, and two inspections. Option D: Over-the-counter review, $300 plan review, and one inspection. Option E: No plan review, $225 administrative fee, and one inspection.
Renewable Energy Tax Credit for International Operations Centers (Personal)
Value:Varies
S.B. 1484 of 2014 provides a tax credit for renewable energy systems used in manufacturing that produce energy. H.B. 2528 of 2017 removes manufacturer eligibility in 2018. Eligible systems must be capable of creating at least 20 megawatts of energy or a typical annual generation of at least 40,000 megawatt-hours. The tax credit of $5 million per year for five years for each facility. Taxpayers must apply to the Department of Revenue; the sooner you apply the better as when the $10 million is gone it is gone.
City of Tucson - Solar Design Requirement for Homes
Value:Varies
In June 2008, Tuscon adopted an ordinance that requires all new single single-family homes and duplexes to be solar-ready. The ordinance was developed by a stakeholder group. New homes must either have a photovoltaic or solar water heating system installed or have the necessary hardware on hand so that such a system can be installed at a later date. This latter option allows a home to have some of the piping installed so that later installation is not that expensive. These requirements may be waived if it can be sufficiently demonstrated to a building official that compliance is not practical due to shading, building orientation, construction constraints, or the configuration of the parcel of land.
Are solar panels worth it in Santa Cruz County, AZ?
If you intend to reside in your home beyond the payback period of your solar system, solar panels are an excellent choice in Santa Cruz County. In Santa Cruz County, AZ, the installation of a 5 kW solar system can save you an average of $24,313.2 over 20 years, with an average break even point of 6 years.
The cost of not having solar panels in Santa Cruz County, AZ
Forgoing solar panels or an alternative backup energy source means you'll miss out on the savings mentioned above and be fully dependent on your electric utility for power. The news has recently shown us that complete reliance on your utility provider isn't always the best idea.
Annually, customers in Santa Cruz County have dealt with approximately 0.67 utility outages.Annually, customers in Santa Cruz County have dealt with approximately 0.67 utility outages. The average duration of each outage is 64.71 minutes. During severe events like equipment failure, tornadoes or wildlife damage, these times can grow significantly longer.
See the graphic below to see the number of current electricity customers without power in Santa Cruz County.
A solar panel system with (or without) a backup battery could ease the stress of future outages you encounter.
Power Outages
Currently, 0 customers are being tracked in Santa Cruz County.
What impacts the cost of solar panels in Santa Cruz County, AZ?
Your Energy Needs - Investing in larger solar panel systems costs more upfront, but the price per watt is decreased as the system size increases. Consumers often realize that installing a solar system that can replace their entire electric bill is advantageous, ensuring maximum savings.
Make & Model - Similar to other industries, the solar energy sector offers a variety of solar panel and mounting equipment brands and designs. Taking into account the system preferences that your installer may have, it's essential to choose a recommended company. Buyers who prioritize superior equipment typically enjoy a superior long-term experience.
Solar Panel Type - For good reason why monocrystalline panels are now the industry standard. Even with a higher cost, this technology yield more energy. The majority of installers opt for panels constructed using this material.
Your Property - Every home and property differs in its own way. Challenges such as trees, sloping terrain, or other barriers can increase the difficulty of installing solar panels. Today, many solar installers can leverage satellite imagery to assess your home and incorporate these aspects into the initial cost estimate.
Labor Rates - Different companies pay varied wages to their employees, and these expenses are eventually borne by the consumers. Businesses often receive higher reviews for their services and customer service when they pay higher wages.
Permitting & Interconnection - Local permitting and utility interconnection fees, which differ by region, will affect your final installation cost. Reputable local installers will integrate these numbers into your first quotes to avoid any surprises.
See what solar panels cost in other Santa Cruz County cities
As of December, 2024, the average per-watt cost for solar panels in Santa Cruz County, AZ is $2.82/W. After federal tax credits, the installation of a 5 kW solar panel system in Santa Cruz County, AZ is estimated to cost $9,870.
If you live in Arizona, you can find 21 rebates and incentives through different utilities and government agencies. Furthermore, the majority of people qualify for the 30% federal tax credit.
Choosing to pay cash ensures the most savings, but today there are several financing options for solar panels that are also cost-effective. Installers typically partner with financing companies and will incorporate this information into your initial quotes.
Yes, solar panels systems of 5 kW in Santa Cruz County, AZ typically have a payback period of 6years, with expected savings on electricity costs of $24,313.2 over 20 years.